Gonka Community Fund
Активация спросаsource: vote.gonka

Bring Gonka to EBC12 as a Gold Sponsor

Fund Gonka’s Gold Sponsor participation at European Blockchain Convention 2026 in Barcelona to expand Gonka’s European presence, meet institutional decision-makers, exchanges, infrastructure partners

Запрос

62 000 USDT

Ответственный

Heydar Naghiyev

Подано

21 мая 2026 г.

Ballot

ONE_WALLET_ONE_VOTE; 26 мая 2026 г. to 2 июн. 2026 г.

OPEN

Yes

1

No

0

Abstain

0

Source tender signal remains available on the proposal page; this ballot records the local fund vote.

Advanced vote context

Reviewer median

45.25

Нет

Raw score

45.25

Final score

45.25

Reviewer scorecards

CriterionWeightValuePoints

Strategic bottleneck

The proposal identifies a plausible strategic bottleneck: Gonka's underdeveloped European presence and need for institutional/exchange/infrastructure access. The bottleneck is credible but not backed by baseline market data or evidence of missed opportunities.

Evidence

  • proposal.problemBottleneck:paragraph 1 - "its market presence is still concentrated outside Europe"
  • proposal.problemBottleneck:paragraph 2 - "Without a strong physical presence in this market, Gonka risks missing conversations with the partners, buyers and ecosystem players that..."
140.7510.5

Network-level leverage

A Gold Sponsorship could provide leverage via booth presence, speaking slots, executive meetings, newsletter/social exposure, and content assets. However, expected downstream conversion to network usage is not specified.

Evidence

  • proposal.scopeIncluded:package list - "Gold Sponsor online and on-site visibility... 1 panel speaking slot... 7 curated 1-to-1 Executive Meetings"
  • proposal.scopeIncluded:package list - "Newsletter mention to EBC’s 65,000+ subscriber audience"
130.759.75

Measurable impact

Impact claims are mostly qualitative. The only structured metric concerns tender voting, not event outcomes or business-development results.

Evidence

  • proposal.successMetrics[0]:target - "2 vote.gonka.vip voters; weighted average bid 50000 GNK"
  • proposal.whyNow:benefits list - "Open conversations with exchanges and infrastructure partners"
120.253

Team / execution reliability

15Team module7.75

Scope / deliverables

The package deliverables are detailed enough to understand what is being purchased, but acceptance criteria, exclusions, roles, and milestone verification are missing.

Evidence

  • proposal.scopeIncluded:package list - "18sqm branded booth with tables for meetings and deal-flow"
  • proposal.deliverables[0].acceptanceCriteria:acceptanceCriteria - "Acceptance criteria must be normalized from the source tender before a formal score is published."
100.757.5

Funding structure / tranches

There is no tranche structure, payment schedule, deposit/final-payment logic, milestone gating, cancellation protection, or refund handling.

Evidence

  • proposal.milestones:milestones array - "[]"
  • proposal.budgetLines[0]:budget line - "Amount inferred from tender title, summary, or description."
900

Budget discipline

The total ask is clear, but there is no itemized cost basis, comparable pricing, package quote, discount, negotiation record, or separation of sponsorship fee from optional expenses.

Evidence

  • proposal.finalAsk:finalAsk - "62,000 USDT"
  • proposal.budgetLines[0]:budget line - "Inferred imported ask"
70.251.75

Incentive alignment

The proposer is affiliated with EBC, the direct seller of the sponsorship package. This conflict is disclosed in comments but not in structured proposal fields, and payment appears tied to purchasing the package rather than measurable Gonka outcomes.

Evidence

  • source.comments[1]:comment reply by Heydar Naghiyev - "я представляю European Blockchain Convention"
  • proposal.conflicts:conflicts field - "Conflict disclosures are not structured in the source tender and must be reviewed manually."
80.252

Sustainability / handover

No plan is provided for post-event reporting, content reuse, lead/contact handover, follow-up ownership, CRM tracking, or conversion accountability.

Evidence

  • proposal.maintenanceHandover:maintenanceHandover field - "Imported tender has no mandatory maintenance / handover field."
  • proposal.scopeIncluded:package list - "YouTube upload and post-event content assets"
70.251.75

Governance precedent / opportunity cost

The proposal requests a significant lump sum for sponsorship without providing alternatives, opportunity-cost analysis, or comparison against other European activation options. This could set a precedent for vendor-led event sponsorships with weak outcome accountability.

Evidence

  • proposal.alternativesOpportunityCost:alternativesOpportunityCost field - "Imported tender has no mandatory opportunity-cost field. Reviewer should add alternatives before publishing a final score."
  • proposal.finalAsk:finalAsk - "62,000 USDT"
50.251.25
Raw score45.25

This is a plausible demand-activation proposal for Gonka to gain European visibility through EBC12 Gold Sponsorship, with a detailed list of package inclusions and a clearly named EBC-side proposer. However, it is materially incomplete for Community Fund approval: no Gonka-side commercial owner is named, no event-success metrics are defined, no budget breakdown or tranches are provided, no milestones or acceptance criteria are normalized, conflicts are only disclosed in comments, and risk/ROI handling is weak. The strongest parts are strategic relevance and package specificity; the weakest parts are measurement, funding discipline, capacity commitment, and post-event accountability. Reviewer questions: - Who is the named Gonka-side accountable commercial owner for the sponsorship, booth, meetings, lead qualification, and post-event follow-up? - Which founders/senior leaders or official representatives will attend, and what time commitment is confirmed? - Can EBC provide an itemized quote or sponsorship contract showing what the 62,000 USDT covers and any taxes, discounts, refund/cancellation terms, or payment schedule? - What are the measurable success criteria: number of completed executive meetings, qualified leads, follow-up calls, partner opportunities, content views, or signed outcomes? - Can payment be structured in tranches tied to contract execution, delivery of booth/speaking/meeting assets, and post-event reporting? - What is the conflict disclosure and approval process given that the proposer represents EBC, the direct seller of the package? - What alternatives were considered, such as smaller sponsorship, attendance-only, side event, targeted roadshow, or other European conferences? - Who owns and receives post-event assets including photos, recordings, attendee/lead lists, meeting notes, and follow-up pipeline? - What mitigation exists if the 7 curated executive meetings are low-quality, cancelled, or not relevant to Gonka? - What post-event report will be delivered to the community and by what date?

Optional voter scorecard

Relevant delivery proof

Weight 4

Domain fit

Weight 3

Technical / operational capability

Weight 3

Commitment / capacity

Weight 2

Governance communication

Weight 2

Maintenance accountability

Weight 1

Strategic bottleneck

Weight 14

Network-level leverage

Weight 13

Measurable impact

Weight 12

Team / execution reliability

Weight 15

Calculated from Team Module

Scope / deliverables

Weight 10

Funding structure / tranches

Weight 9

Budget discipline

Weight 7

Incentive alignment

Weight 8

Sustainability / handover

Weight 7

Governance precedent / opportunity cost

Weight 5